A plant this size on a factory roof means 32,000 m² of roof, thousands of panels, tens of thousands of metres of cable and a medium-voltage grid connection, all in 120 days.
What we did
Turnkey execution, so the client coordinated no other contractors.
More than 8,800 panels installed across 32,000 m² of roof.
Over 90,000 m of cabling, routed and labelled.
Medium-voltage connections carried out.