Solar · Industrial

A 5.25 MW plant on one factory roof, in 120 days.

Aerial view of the plant covering the factory roof in 10th of Ramadan
Client
Solar developer
Location
10th of Ramadan
Scope
Turnkey execution
Duration
120 days
5.25MWInstalled capacity
8,800+panelsOn one roof
90,000+mOf cabling
32,000m²Roof area
120daysFrom start to connection

The challenge

A plant this size on a factory roof means 32,000 m² of roof, thousands of panels, tens of thousands of metres of cable and a medium-voltage grid connection, all in 120 days.

What we did

  • Turnkey execution, so the client coordinated no other contractors.
  • More than 8,800 panels installed across 32,000 m² of roof.
  • Over 90,000 m of cabling, routed and labelled.
  • Medium-voltage connections carried out.
Installation crew in high-visibility vests on the panels at sunrise
Crew on the roof
Medium-voltage transformer station with its doors open
Medium-voltage connection
DC cables entering the inverter
Inverter connections
Cables routed and labelled under the inverter
Cable routing and labelling
Close view of the solar panels
Panels